Heavy-duty pipe end forming equipment designed for oil industry casing pipe processing. Hydraulic drive system provides stable and powerful swaging force for large diameter steel pipes. Ideal for oil field and petrochemical industry pipe end forming applications.
Hydraulic drive system, powerful and stable swaging force
Designed for end reduction and pre-connection forming of oilfield pipe, casing and large-diameter steel pipe used in petrochemical applications. It prepares controlled end geometry for subsequent assembly, welding or dedicated connection processes while accounting for diameter, wall thickness, material strength and forming length.
Oilfield Pipe
Oil Casing
Petrochemical Industry
Customization Scope
Dies and hydraulic parameters can be engineered for the original diameter, wall thickness, steel grade, target end diameter, forming length and permitted ovality. Pipe support, positioning and automatic or manual control are configurable. Pipe standards, drawings or samples are required to verify tonnage and trial requirements.
Pipe Processing / Swaging
How the Machine Works
A rigid frame, hydraulic actuator and staged dies matched to the pipe end apply controlled radial forming to casing or thick-wall pipe. Material strength, wall thickness, reduction, transition length and final ovality must be reviewed together.
Inputs Required for Selection
Incoming section, diameter or side size, wall thickness and length
Material grade, weld-seam position and incoming surface condition
Target end dimensions, formed length, finish and mating relationship
Tolerance, inspection method and required retained samples
Planned output, handling method, electrical supply and floor space
Configuration Options to Review
Workpiece-specific dies, positioning and support
Manual, semi-automatic or linked controls
Feeding, receiving and line integration
Local voltage, guarding and operator interface
Sample trials and parameter records for special parts
Trials and Acceptance
Inspect fasteners, lubrication, hydraulics, electrics and safety devices
Check no-load movement, control logic and emergency stops
Run material trials with the agreed workpiece
Measure critical dimensions and finish against drawings or samples
Confirm trial records, packing list and supplied information
Before Delivery and Installation
Confirm machine size, weight, unloading route and installation position
Prepare the specified power supply, foundation and working clearance
Check the main machine, dies, accessories and documents against the packing list
Complete safety and no-load checks before the first production trial
Maintenance Priorities
Check lubrication, hydraulic oil and fasteners according to the maintenance information
Remove debris and dust from dies, rolls or finishing zones
Record common settings, unusual noise, alarms and workpiece changes
Match machine identity, specification and photos before ordering a replacement
Frequently Asked Questions
Can high-strength casing use ordinary pipe settings?
No. Actual grade and wall thickness must be used to review load, springback, lubrication and die clearance.
Why provide the mating connection?
It verifies the end geometry, transition and assembly relationship instead of checking one diameter only.
✓
Success.
Thank you for your inquiry! Your request has been received.
Our engineering sales team will contact you within 24 hours.
⚠
Send Failed.
Sorry, there was a problem submitting your inquiry. You can try again, or contact us directly using the information below:
Please fill out the form with your requirements. Our engineering sales team will review your application and provide a detailed quotation for the selected machinery.